April 24
We are building a house. Not just any house, but an 1850s-style octagon house, the kind that used to be found here and there on the Midwestern prairie. For most of the construction we use existing materials that Jim has scrounged over the years. Read on and enjoy! — Jim & Sam






Feb. 1 2012
In a construction project winter is nearly always a down time. That is not the case on this project. Sam and I work nearly every day preparing materials for the construction that will pick up as soon as warm days arrive here again. First and foremost is the shaping of stone. The bars of limestone we purchased last summer must all be cut to length and then carefully dressed to produce the quoins and trim we will need. This is accomplished with a six pound hammer and a variety of stone cutting chisels. The split pieces are pretty rough until exposed to the hammer and chisel. It is mind-bending work and takes from 15 to 60+ minutes per piece depending on the condition of the original block. Hardest is the creating of a 45 degree angle on the corner quoins without damage to the thin edge. We will need 90 of them as well as nearly 200 flat ended pieces to frame the windows and doors. Lastly are the 100 pieces needed for arches and base trim. The dressing is done in the basement near the warmth of the wood stove. Dust and chips fly everywhere. We are nearing one quarter of all the pieces completed.
The arm, heart and mind get a little weary of stonework as a steady diet so we have also worked on restoring the wood trim for the gingerbread porch we acquired last fall. There were lots of missing pieces to be fabricated and then glued up as well as the paint stripping and sanding to be done. The 10 posts are finished and look like new. We have turned to the 24 brackets and accompanying gallery, and on the warm days we can work outside in the winter sun. Jim
My brother stayed for a week and a half on his vacation to help strip the bracketing and handle the long limestone bars that we split. It was a great help. Sam

Dec.2
The site is now officially closed for the season. It seemed to go very slowly as we worked this summer but seeing all the first floor block walls in place on top of their four foot footings, and the basement in under the kitchen and bath, and the sewer and water in, and most of the landscape dirt in place, and the stones for the landscaping in piled and waiting for spring, and most of the wood we’ll need stacked and ready…. Well, it is really quite amazing.
The structural lumber came from an ad on Craig’s list (Thanks John for helping with a truck and trailer to pick it up!) Some of it will have to be sized to a standard 2x10 but that along with dressing all the limestone and stripping and repairing all the porch parts will be a winter’s project. There is also wood to plane, stringers for stairs to make, etc. etc. etc.! Should be a busy winter as well.
Sam got lucky this week when an old friend offered him a piece of furniture for the finished house… a beautiful buffet for the dining room. It is in a style that both he likes and will match the period of the house. Jim
Today, weather permitting; a few of my family and friends will be heading to Hudson to see the beautiful octagon. It was a year ago that Jim and I saw it for the first time. I imagine that on today’s trip all will be shocked. It is one thing to see a hole in the ground, and then block walls, but few people can imagine what the end product of our pile of materials will even look like. It will be a good time and a real eye opener. Jim has homework for me on this trip. We need a few measurements with the cupola and roofline. Proportion is important and we want to be sure to get it right. Sam


We were able to acquire a wonderful historic porch with gingerbread trim from a house about to be demolished. The trim was already partly damaged by water and lack of paint but with effort it should all be restorable. Both Sam and I felt bad about removing the wood as the house is a real gem and was worthy of preservation, yet, the condition of the brickwork as well as the house in general would have made restoration a very spendy project. The owner was thinking of selling the trim to an architectural antiques place where it would have been divvied-up and sold with no connection to its origins. I at least feel good that it has found a home here and will find a new life not too far from its original location. It ought to make the octagon a spectacular stand-out when it is re-assembled. Jim
I am a bit apprehensive to make grandiose proclamations. Being pleased and impressed with the progress we have been able to make thus far brings me to an interesting circumstance that has evolved as this project has developed throughout the summer. There is no time. There are weeks of sheer joy with the work I have done and progress that we have been able to make, this week being as such. There are other weeks where the sun doesn’t seem to shine and ambition is sorely lacking. I have however adjusting to the absence of time. This fall is the first time where I have not gone back to school and it was a little hard at first to adjust to. Initially I kept precise track of my time and felt that time meant progress. This has changed. I am sure that the feeling of joy and desperation will continue but the work must go on. Sam